GuideOct 27, 20264 min read
How to Calculate Required Run Rate in a Chase
The required run rate tells you how fast the chasing team must score from this point to win. It changes after every ball.
The formula
Required run rate = runs still needed divided by overs remaining. Using balls, it equals runs needed times six divided by balls left.
Example 1
A team needs 60 runs from 5 overs. 60 divided by 5 is 12 runs per over. The batters need to average 12 an over.
Example 2
A team needs 45 runs from 24 balls. 45 times 6 is 270. 270 divided by 24 is 11.25 runs per over.
Compare with the current run rate
If the current run rate is above the required rate, the chasing team is ahead. If it is below, they have to speed up or lose wickets trying.
Wickets matter too
A high required rate with eight wickets in hand is very different from the same rate with two wickets left. Always read the rate together with wickets in hand.
The chase meter
On every Crease match page the chase meter turns these numbers into a simple bar, so you can see at a glance whether the chase is on track.
Quick answers
What is run rate?
Runs scored divided by overs faced.
What is a good required rate in T20?
Rates under about 8 an over are usually manageable. Above 12 gets difficult unless the batters are well set.
Does the rate include extras?
Yes. All runs count toward the target.